Enjoy Stelvio Valtellina
29 May 2027 (Saturday) – 18 September 2027 (Saturday) expected 187 days
With a free account: your own calendar, notifications about changes and the registration deadline.
In the Stelvio National Park summer series from late May to September, the legendary Valtellina climbs – Stelvio, Gavia, Mortirolo, the serpentine to the Cancano lakes and several other routes – are closed to motor traffic for one morning or day at a time. Not a race: free, no registration required, participation is possible by bicycle and on foot.
Machine translation
Programme by day
- Day 1 29 May 2027 (Saturday) San Marco Pass (from Albaredo and Mezzoldo), 9–15 pm
- Day 2 4 June 2027 (Friday) Gavia Pass (from Santa Caterina Valfurva and Sant'Apollonia), 9–13 pm
- Day 3 7 June 2027 (Monday) Cancano Lakes climb (Fior d'Alpe, Valdidentro), 9–13 pm
- Day 4 8 June 2027 (Tuesday) Mortirolo Pass (from Mazzo and Monno), 8:30–12 pm
- Day 5 27 June 2027 (Sunday) Splügen Pass (from Campodolcino and Splügen), 8–14 pm
- Day 6 10 July 2027 (Saturday) Cancano Lakes climb (Fior d'Alpe, Valdidentro), 9–13 pm
- Day 7 7 August 2027 (Saturday) Campo Moro, night climb from Lanzada, 19–24 pm
- Day 8 26 August 2027 (Thursday) Cancano Lakes climb (Fior d'Alpe, Valdidentro), 9–13 pm
- Day 9 27 August 2027 (Friday) Mortirolo Pass (from Mazzo and Monno), 8:30–12 pm
- Day 10 29 August 2027 (Sunday) Gavia Pass (from Santa Caterina Valfurva and Sant'Apollonia), 9–13 pm
- Day 11 18 September 2027 (Saturday) Stelvio Pass from Bormio (Bagni Vecchi), 9–13 pm